Skip to main content

Content block block-countyoc-docaccessscript

Body

Content block block-countyblocksalert--2

Alert: replacereplace

Content block block-countyoc-views-block-site-alert-alert-site-block-1--2

Select a language:
Orange County Government Logo -- OC Home
Facebook Created with Sketch. Twitter Created with Sketch. Instagram Youtube Created with Sketch.
OC Waste & Recycling Logo -- Home
  • About Us
    • Annual Report
    • OC Sustainability
    • Contact Us
    • FAQs
    • Newsroom
    • Mission and Vision Statement
    • Speakers Bureau
    • Environmental Programs
    • OCWR Regional Leadership
    • Strategic Plan
    • Waste Management Commission
    • Waste Management Commission Agenda Archive
    • Quick Links
  • Hazardous Waste
    • Business Hazardous Waste Referrals
    • Fact Sheets
    • Household Hazardous Waste Pick-up Eligibility
    • Illegal Disposal
    • Locations and Hours of Operation
    • Materials Exchange Program
    • Medication and Sharps Disposal
    • Smoke Alarm or Detector
  • Landfills
    • Active Landfills
    • Anatomy of a Landfill
    • Cover Your Load - It's the Law!
    • Fact Sheets
    • Landfill Fees
    • Landfill Regulations
    • Landfill Tours
    • Soil Disposal
    • Closed Landfill Sites
  • Report a Concern
  • Compost & Mulch
    • Bulk Pick Up & Delivery
    • Compost Certifications
    • Greeneries & Compost Tips
    • Submit a Request
  • Learn
  • Events
  • SB 1383 Organics Recycling
    • Commercial Organics Recycling
    • Enforcement
    • Grant Program
    • A Better Tomorrow Starts Now
    • Implementation & Compliance
    • Residential Organics Recycling
Search

Content block block-countyoc-breadcrumbs

Breadcrumb

  1. Home
  2. News
  • About Us
    • Annual Report
    • OC Sustainability
    • Contact Us
    • FAQs
    • Newsroom
    • Mission and Vision Statement
    • Speakers Bureau
    • Environmental Programs
    • OCWR Regional Leadership
    • Strategic Plan
    • Waste Management Commission
    • Waste Management Commission Agenda Archive
    • Quick Links
  • Hazardous Waste
    • Business Hazardous Waste Referrals
    • Fact Sheets
    • Household Hazardous Waste Pick-up Eligibility
    • Illegal Disposal
    • Locations and Hours of Operation
    • Materials Exchange Program
    • Medication and Sharps Disposal
    • Smoke Alarm or Detector
  • Landfills
    • Active Landfills
    • Anatomy of a Landfill
    • Cover Your Load - It's the Law!
    • Fact Sheets
    • Landfill Fees
    • Landfill Regulations
    • Landfill Tours
    • Soil Disposal
    • Closed Landfill Sites
  • Report a Concern
  • Compost & Mulch
    • Bulk Pick Up & Delivery
    • Compost Certifications
    • Greeneries & Compost Tips
    • Submit a Request
  • Learn
    • Take the EcoChallenge!
  • Events
  • SB 1383 Organics Recycling
    • Commercial Organics Recycling
    • Enforcement
    • Grant Program
    • A Better Tomorrow Starts Now
    • Implementation & Compliance
    • Residential Organics Recycling
  • About Us
    • Annual Report
    • OC Sustainability
    • Contact Us
    • FAQs
    • Newsroom
    • Mission and Vision Statement
    • Speakers Bureau
    • Environmental Programs
    • OCWR Regional Leadership
    • Strategic Plan
    • Waste Management Commission
    • Waste Management Commission Agenda Archive
    • Quick Links
  • Hazardous Waste
    • Business Hazardous Waste Referrals
    • Fact Sheets
    • Household Hazardous Waste Pick-up Eligibility
    • Illegal Disposal
    • Locations and Hours of Operation
    • Materials Exchange Program
    • Medication and Sharps Disposal
    • Smoke Alarm or Detector
  • Landfills
    • Active Landfills
    • Anatomy of a Landfill
    • Cover Your Load - It's the Law!
    • Fact Sheets
    • Landfill Fees
    • Landfill Regulations
    • Landfill Tours
    • Soil Disposal
    • Closed Landfill Sites
  • Report a Concern
  • Compost & Mulch
    • Bulk Pick Up & Delivery
    • Compost Certifications
    • Greeneries & Compost Tips
    • Submit a Request
  • Learn
    • Take the EcoChallenge!
  • Events
  • SB 1383 Organics Recycling
    • Commercial Organics Recycling
    • Enforcement
    • Grant Program
    • A Better Tomorrow Starts Now
    • Implementation & Compliance
    • Residential Organics Recycling

Content block block-articlepretitle

Type
News

Content block block-countyoc-page-title

Bowerman Landfill Update

Content block block-countyoc-content

April 19, 2023
Image
FRB Landfill Update
FRB Update.png
Body

4/19/23 Update

The April FRB community meeting included the following updates:

  • New Flare 6 Update 
  • LFG Collection System Improvements
  • Phase VIIIA-1 Development Overview
  • Bee Canyon Greenery Received US Composting Council Certification for Mulch Product
  • Invitation to Residents to Request for Free Compost and Mulch at www.oclandfills.com/compost
  • Odor Management Recap
  • The next virtual public meeting is set for July 19, 2023 at 6 p.m.   

XXX

 

1/18/23 Update

The January FRB community meeting included the following updates:

  • New Flare 6 Installation and LFG Collection System Improvements
  • LFG Collection System Improvements
  • Phase VIIIA-1 Development Overview
  • Bee Canyon Greenery Update ~ US Composting Council Certification for the  mulch product in progress.
  • Community Compost Giveaway Event ~ April 1, 2023

XXX

 

9/22/22 Update

The September FRB community meeting included the following updates:

  • New Flare 6 Installation and LFG Collection System Improvements
  • Phase VIIIA-1 Development Overview
  • Bee Canyon Greenery Update ~ Received US Composting Council Certification for the compost product.
  • Community Compost Giveaway Event ~ November 5, 2022

XXX

 

7/20/22 Update

The July FRB community meeting included the following updates:

  • New Flare 6
  • Bee Canyon Greenery Update / $3M CalRecycle Organic Grant, Phase 1B Expansion is underway to expand facility from 18 acres to 30 acres. Pursuing US Composting Council Certification for the compost product.
  • Phase VIIIA-1  

The meeting concluded with a question and answer session.

xxxxx

 

5/18/22 Update

The May FRB community meeting included the following updates:

  • Thermal Oxidizer / Portable Mobile Flare
  • New Flare 6 Addition
  • Bee Canyon Greenery Expansion / $3M CalRecycle Organics Grant
  • Free Compost Giveaway / Saturday, May 21st from 9 a.m. to 3 p.m.

The meeting concluded with no questions from the audience.

xxxxx

 

3/16/22 Update

The March FRB community meeting included the following:

  • Odor Management Strategies
  • Thermal Oxidizer / Portable Mobile Flare
  • New Flare 6 Addition
  • Alternative Daily Cover (ADC) Pilot Project
  • Expanded Misting System
  • Neighbor Support Portal (NSP)

The meeting concluded with a question and answer session.

xxxxx

 

1/21/22 Update

The January FRB community meeting included the following:

Odor Report Update.  In August through December 2020, FRB received 65 odor complaints. In 2021, FRB received 27 odor complaints during the same timeframe.

Landfill Best Management Practices Underway.

  • Odor Response. Residents were encouraged to utilize the Neighborhood Support Portal (NSP) for odor reports (LINK)
  • Continuous spraying of odor neutralizer at end of each day and prior to the start of each day
  • Ensure loads are fully covered upon arrival and remain covered until they reach the active area
  • Keeping the active area as compact as possible minimizing the usage of tarps and soil
  • When it is necessary to utilize tarps, delay morning untarping operations
  • Extended the hours of the misting system in the morning and late evenings to help manage odors from the landfill. Increase concentration of odor neutralizer
  • Evaluating alternative technologies for daily cover
  • Installation of six new horizontal collectors to increase collection of landfill gas

The meeting concluded with a question and answer session.

xxxxx

 

 

11/18/21 Update

The November FRB community meeting included the following:  

Odor Report Update. In September and October 2020 FRB received 30 odor complaints. In 2021 FRB received 10 odor complaints during the same timeframe.  

Landfill Best Practices Underway.   

  • Continuous spraying of odor neutralizer at the end of each day and prior to the start of each day.   
  • Ensuring loads are fully covered upon arrival to landfill.  
  • Keeping the active area as compact as possible, minimizing the usage of tarps and soil.  
  • Delaying morning untarping operations.   
  • Extending the hours of the misting system in the morning and late evenings. Increase concentration of odor neutralizer.   
  • Evaluating alternative technologies for daily cover.  

Bee Canyon Greenery Update. In October 2020, we launched the Bee Canyon Greenery to recycle greenwaste into compost, which helps to reduce greenhouse gases, enrich local soil and conserve landfill capacity. Our composting facility also supports legislative mandates established by AB 1594, AB 1826 and SB 1383. To date we have processed 7,631 tons of compost.   

Residents were invited to reach out to Francine.Bangert@ocwr.ocgov.com for a landfill or greenery tour.  

 The meeting concluded with question and answer session.  

xxxxx 

 

 

09/16/21 Update

Our landfill capacity is a finite resource and recycling rather than burying appropriate materials is an important part of our job at FRB. At our community meeting this week we highlighted several programs currently underway that preserve landfill space and recover recyclable resources.

  • In October 2020, we launched the Bee Canyon Greenery to recycle greenwaste into compost, reducing greenhouse gases and conserving landfill capacity. Our composting facility also supports legislation initiatives set by AB 1594, AB 1826 and SB 1383. To date we have processed 5,263 tons of compost. 
  • FRB partners with the Mattress Recycling Council to increase used mattress recycling. The landfill provides a location for businesses and residents to take unwanted mattresses and box springs, where they will be recovered and recycled versus buried.  Each week the used mattresses are transported to a recycling facility. To date we have processed 3,035 units (167,620 lbs.).
  • Metal recovery is part of our recycling efforts at FRB. Metals and large appliances such as stoves, water heaters, dishwashers, refrigerators, washers and dryers are pulled out of the waste stream and set aside for reuse. To date we have processed 188 tons.
  • In April 2021, FRB converted our large off-road equipment from diesel to an alternative cleaner-burning fuel, thus reducing GHG, NOX, PM and SOX emissions. 

The meeting concluded with an update on the permitting process to install the new flare.  Public notice from SCAQMD was sent out on 8/27/21, providing nearby residents the opportunity to be fully informed about the project and to provide comments. EPA review period ended 9/13/21. Public comments are due 9/26/21. The public notice also lists emissions from the new proposed flare. 

xxxxx

 

08/19/21 Update 

OCWR is planning to install a new state-of-the-art flare at FRB. The new flare will provide the newest/best technology for reduced emissions. The new flare adds landfill gas collection and control capacity.    

The authorization process to install the new flare includes a public notice from SCAQMD, which provides nearby residents the opportunity to be fully informed about the project and to provide comments. The public notice also lists emissions from the new proposed flare. 

*Estimated project timeline:   

  • August 2021 – Public notification obtained from SCAQMD and delivered by OCWR 
  • September/October 2021 –SCAQMD permit anticipated  
  • December 2021/January 2022 – Tentative construction commences   
  • February/March 2022 – Flare operational   

* Pending unanticipated delays. 

Monthly virtual meetings will continue on the third Wednesday of each month. 

The next public meeting is set for September 15, 2021 at 6 p.m.   

xxxxx 

 

07/22/21 Update 

Repairs to the Phase VIIIB-2 liner (Eastern Portion) damaged from the Silverado Fire has been completed. Phase VIIIB-2 liner (Western Portion) received SCAQMD Waste excavation permit on May 19, 2021. The repairs commenced on June 1, 2021 and were completed on July 22, 2021. Water Board approval pending to begin waste disposal.  

OCWR has implemented a number of recycling programs at the Bowerman Landfill.  Since October 2020 the Bowerman Landfill has composted 4,791 tons, recycled 2,355 mattresses and 98 tons of metals.  

OCWR is planning a new flare installation, which requires SCAQMD notification. OCWR also will send an accompanying informational flyer to help further explain. The new flare will provide the newest/best technology for reduced emissions. The new flare adds landfill gas collection and control capacity.   

Estimated project timeline:  

  • July 2021 – Public Notification obtained from SCAQMD and delivered by OCWR  
  • August 2021 – Permit finalized and provided by SCAQMD  
  • September 2021 – Tentative Construction commenced  
  • February 2022 – Flare operational  

OCWR received a request from the Orange County Health Care Agency HAZMAT section to support an emergency-controlled detonation of improvised explosives. This type of request is made in accordance with a Memorandum of Understanding (MOU) established between the sister agencies that assures mutual aid in times of emergency.   

On July 21, between 10 and 11 am the OC Sheriff’s Hazardous Devices Section (HDS) detonated explosive materials which had been collected during the Fourth of July holiday. The operation was a result of coordination between Orange County Sheriff, Orange County Health Care Agency HAZMAT section, and the Orange County Fire Authority. OC Sheriff tactical medics were on site to ensure the health and safety of all involved.  

The result of the operation was the safe successful controlled detonation of 20 pounds of improvised explosives and the destruction of approximately 20 pounds of black powder, a chemical explosive. Improvised explosives are susceptible to heat, shock and friction and cannot safely be stored, which is why an emergency-controlled detonation was required.    

Monthly meetings will continue on the third Wednesday.  

The next public meeting is set for August 18, 2021 at 6 p.m.  

xxxxx

 

06/18/21 Update

Bowerman’s landfill and resource recovery operations are running smoothly. Phase VIIIB-2 (Eastern Portion) has been completed. Phase VIIIB-2 (Western Portion) received SCAQMD Waste excavation permit on May 19, 2021. The repairs commenced on June 1, 2021 with a target completion of August 2021. The paving project and misting system have been completed and will see benefits such as safety improvements, stormwater control and odor control measures. Since October 2020 OCWR has composted 3,924 tons, recycled 1,935 mattresses and 80 tons of metals. 

OCWR is planning a new flare installation, which requires SCAQMD notification. OCWR also will send an accompanying informational flyer to help further explain. The new flare will provide the newest/best technology for reduced emissions. It diverts gas from existing older flares for improved air quality and adds landfill gas collection and control capacity.  

Estimated project timeline: 

  • July 2021 – Public Notification obtained from AQMD and delivered by OCWR 
  • August 2021 – Permit finalized and provided by AQMD 
  • August 2021 – Construction commenced 
  • February 2022 – Flare operational 

Monthly meetings will continue on the third Wednesday. 

The next public meeting is set for July 14, 2021 at 6 p.m. 

 

xxxxx

05/19/21 Update

Bowerman’s landfill gas system repairs are completed. The Phase VIIIB Liner (Eastern Portion) received approval from Regional Water Board on April 30, 2021, to accept waste in an area previously damaged. Phase VIIIB Liner (Western Portion) received 1150 Waste Excavation Permit from SCAQMD/EPA on May 19, 2021. OCWR will begin mobilizing contractors for repairs. The permit will allow OCWR to excavate waste to connect the new liner with the existing liner. Expected completion with Regional Board approval is 07/1/2021. 

The SCAQMD variance is scheduled to terminate on June 30, 2021. OCWR continues to provide weekly reports to the SCAQMD. 

The next public meeting is set for June 16, 2021 at 6 p.m. 

xxxxx

02/17/21 Update

Final repairs to the landfill liner, stormwater system and landfill gas collection system are underway or will begin the first week of March. These are the remaining, major components required to complete remediation of Bowerman Landfill following the Silverado Fire last October. The condensate sump was installed mid-February, however the thermal oxidizer remains in use to enhance gas collection. 

On February 17, 2021, the AQMD held a Variance Status Update hearing. The Board unanimously approved extending  the variance to an end date no later than 06/30/21.  

xxxxx

 

01/22/21 Update

The remediation effort continues smoothly toward completion. OCWR continues to make repairs to the damaged liner in Phase VIIIB2.  Final repairs will be made once the AQMD issues a permit to tie in the new liner to the undamaged liner.  One of the final phases is fabrication and installation of a permanent, new sump for the landfill gas collection system, replacing equipment that was destroyed in the fire. The Sump is a pumping system that manages the landfill condensate, this new sump will provide increased gas flow to the plant.

While staff makes great strides in bringing all systems back to 100% operations, we continue to enhance current landfill gas collection efforts by utilizing the Thermal Oxidizer.

 In December, the AQMD approved a variance addressing OCWR’s ability to control emissions as repairs are made to the landfill gas collection system. The variance extends through June 2021. There is an update/status hearing set for February 17, 2021.

xxxxx

 

12/18/20 Update

The landfill re-opened November 30, as significant progress in restoring the site was achieved ahead of schedule. The flares are operational, and the gas collection system is restored to 80 percent of pre-fire capacity.  We continue to use a thermal oxidizer to supplement gas collection until the permanent repairs to the landfill gas collection system are completed.

On December 17, the South Coast Air Quality Management District’s Hearing Board held a formal hearing regarding a variance request made by OCWR. The variance specifically responds to the landfill’s ability to control emissions as repairs are made to the landfill gas collection system. After several hours of testimony by County staff and questions posed to them, as well as comments by residents, the AQMD Hearing Board approved the variance, which extends through June 30, 2021. OCWR will return to the Board on February 17, 2021 for a status hearing. 

Ongoing remediation and Good Neighbor activities: 

  • Community air monitoring will continue through January 2021.
  • Repair of Phase VIIIB liner scheduled to commence in January 2021 (Pending Regulatory Approval).
  • Construction of permanent misting system scheduled; to be completed end of January 2021.

xxxxx

12/3/20 Update

12:45 p.m. Update

To provide staff a buffer of daylight visibility to safely close FRB this evening, Frank R. Bowerman (FRB) Landfill will close down to all traffic one hour early at 4 p.m.  today. We plan to reopen with normal hours tomorrow morning. Operations at Olinda Alpha and Prima remain unchanged. The fire is current uncontained and FRB operation hours may change as the fire progresses. Please check back on this page or call 714-834-4000 for more updates. 

xxxxx

11:21 a.m. Update

Once the Bond Fire in Irvine developed, FRB landfill staff initiated Fire Watch protocol to closely monitor the conditions near the landfill site. High winds, ash and smoke will impact areas throughout Irvine in the coming days.  

At this time FRB remains open and we are monitoring evacuation orders from OCFA and the Irvine Police Department.

Residents are encouraged to follow OCFA PIO on Twitter or visit https://ocfa.org/ for updates.  OCWR anticipates continuing with the planned meeting this evening.

xxxxx

11/23 Update

Landfill operations to resume Monday, Nov. 30

As of this morning, we are ahead of schedule on the recovery effort as repairs to the landfill gas collection system have been substantially completed. All five landfill gas flares are operational. We will return to optimal levels of gas collection on Monday, November 30, 2020, with collection continuing to increase after that as we fine tune the well field over the next three to four weeks.

This milestone in the recovery effort will help mitigate the odor nuisance. However, the results of this phase may not be evident overnight. We will continue to monitor and evaluate all environmental data to assist in our improvement efforts.    

The landfill's ability to begin accepting waste again will not impact our efforts in managing the LFG system.   

Please continue to use the Neighbor Support Portal to submit questions and concerns.

xxxxx

11/23 Update

Frank. R. Bowerman Reopening

Our initial repair progress has exceeded the projected timeline. As of now we are projecting completion by Nov. 27 and will resume landfill operations on Nov. 30.

In addition, the power plant is on track to resume operations on Nov. 30 which will further extract landfill gas.  Over the next month we will tune the well field to optimize the performance of the landfill gas collection and control system.

xxxxx

11/19 Update

Chronicle of Ambient Air Monitoring

The Silverado Fire began around 6:52 a.m. on October 26, 2020, along Santiago Canyon road approximately 2 miles east of the landfill during extremely high wind conditions. The fire burned 12,466 acres in the middle of Orange County and caused enough damage to the FRB Landfill that normal operations have yet to resume. To provide information and respond to concerns from the neighboring communities, OCWR immediately initiated biweekly community meetings. Very soon after OCWR began to perform ongoing air monitoring, testing, and analysis to ensure the landfill was not a source of health concerns for the community. Below is a chronicle listing of those events:

  • On our 11/2/20 community meeting, we heard the community’s concerns with air quality as it relates to health and safety
  • On 11/3/20 we initiated neighborhood monitoring for ambient air hazards using handheld devices
  • On 11/3/20 we initiated planning for ambient air sampling
  • On 11/4/20 we contracted sampling to take place for Landfill Compliance and to review the laboratory analytical ambient air data for health and safety concerns
  • On 11/5/20 a 24-hour sampling event was started on the landfill property between the active landfill and the property boundary.
  • On 11/6/20 the 24-hour sampling concluded, and samples were sent to a certified laboratory for expedited processing.
  • On 11/10/20 the laboratory results were received and reviewed
  • On 11/12/20 the results were shared at the community meeting
  • On 11/14/20 the City of Irvine reached out with information on a study being performed by their environmental consultant group Delta.
  • On 11/16/20, OCWR engaged with a health risk assessor and toxicologist to ensure to review the ambient air data collected by the County and City’s consultant.
  • On 11/18/20, OCWR was able to provide an executive summary prepared by the toxicologist to the City of Irvine regarding OCWR’s and Group Delta’s results. This executive summary was included as an attachment to the Group Delta Report presented to the Irvine City Council.
  • Although the findings of all the toxicologists report no health hazards associated with ambient air in the community, OCWR identified the benefit of continued health risk sampling and analysis during the duration of landfill repairs and for a duration after repairs are complete.
  • The continuation health risk sampling will commence on Friday and will continue on a weekly basis through the completion of the monitoring program.
    • 24-hour collection by canisters placed in the community
  • Daily field monitoring will continue with handheld devices as initiated earlier in November.

xxxxx

11/16 Update

Testing Update:

· The County has been performing air quality testing on the landfill, near the landfill property boundary, and on-going air monitoring in the neighboring community.

· Our on-site tests have shown there is no immediate danger to life or health, and toxins are below the regulatory thresholds that apply to OCWR employee safety.

· As we all know it is important for testing results to compare to levels that are appropriate for short term duration and not just look at content without considering historical background air quality data or duration of an event or other contributing factors.

· We have engaged a toxicologist to analyze the data, identify appropriate reference levels, and provide further details regarding the test results which we will share with the community specifically in response to your health and safety concerns.

Operational Update:

· LFG Collection System repairs continue, previously we stated the flares were scheduled to be operational on 11/22. Today, the flares were turned on at 1 pm and have begun the process of destroying landfill gas.

· LFG repairs to the remaining collection wells will continue at a rapid progression. New estimated timeframe for the damaged collection wells to be brought online is 11/26 ahead of the 12/11 original completion date.

· Once LFG system is activated, OCWR and Powerplant will work to tune the well field to optimize collection and performance.

· To further assist the neighboring communities experiencing odors, OCWR has obtained a portable thermal oxidizer which has been brought online today and will assist with supplemental LFG extraction.

· Through well field tuning, OCWR is working with Bowerman Power to bring the power plant online to further increase landfill gas collection.

xxxxx

11/12 Update

On October 26, 2020 the Silverado Fire extended to the Frank R. Bowerman Landfill in Irvine and forced the temporary closure of the Landfill. The fire impacted several areas of the landfill, including damage to electrical infrastructure and portions of the LFG Collection and Control equipment. Thankfully, no customers or employees were injured as a result of this devastating fire.  

In response to the damage caused by the fire, OCWR quickly mobilized forces to make necessary repairs to damaged landfill infrastructure.  OCWR is working to minimize, to the greatest extent possible, impacts that might be felt in surrounding communities, however the shutdown of the landfill gas system creates an increasing possibility that landfill odors may be noticed in neighborhoods near the landfill.   All regulatory agencies involved with the environmental control of the landfill, including the SCAQMD, are aware of this temporary situation and have issued necessary waivers as we work seven days per week to restore the landfill to full compliance.   

Current Status of Landfill Repairs: 

  • (Completed) October 31:  All exposed wellheads or other LFG source points have been capped and staff is actively monitoring the site for new LFG emissions. 
  • (Completed) November 6: Power restored to site.  Southern California Edison crews worked to repair or replace 43 power poles and other impacted electrical infrastructure.   
  • (In Progress): Bring flare stations back online. (Estimated completion November 22) 
  • (In Progress): Complete gas collection and control system repairs. (Estimated completion December 14) 
  • (In Progress):  Coordination with Bowerman Power on resuming LFG energy production and well field tuning.   

Community Updates 

OCWR has held two online community meetings/Q+A sessions. Another is scheduled for Thursday, November 12 at 4 p.m.  You can use this link to connect to the next online session:  

LINK TO NOV. 12 SKYPE MEETING 

Updates regarding the status of the landfill can be found on OCLandfills.com, in the News & Headlines section at the bottom of the home page.  If you have concerns or questions, please use our Neighbor Support Portal – CLICK HERE for the quickest response. 

OCWR sincerely appreciates residents’ understanding while we work to repair the landfill systems. 

Sincerely, 

Tom Koutroulis 

Links in this section relate to Body

Content block block-sociallinksblock

Share This

  • Share this page to Facebook
  • Share this page to Twitter
  • Share this page to Linkedin
  • Copy this page as a Link

Content block block-customjs

Body Links in this section relate to Body
Orange County Government Logo -- OC Home

County Directory Assistance

855.886.5400

Navigation

Quick Links

  • Acceptable Use
  • Accessibility
  • Contact the County
  • Disclaimer
  • Sitemap

Resources

  • Privacy Policy

Follow Us

  • Connect on Facebook
  • Connect on Twitter
  • Connect on Youtube
  • Connect with RSS
  • Connect on Chat
  • Connect on Flickr
  • Connect on Apple
  • Connect on Google

The OCTM

Making Orange County a safe, healthy, and fulfilling place to live, work, and play, today and for generations to come, by providing outstanding, cost-effective regional public services.

Browser Support Notice

This browser is no longer supported and some key features will not work. We strongly recommend using Edge, Chrome 70+, Safari 5.x+ and Firefox 5.x+.

Tuyên bố miễn trừ trách nhiệm

Để tạo sự tiện lợi cho người dùng, trang web của Quận Cam này sử dụng dịch vụ dịch ngôn ngữ miễn phí của Google. Khi nhấp vào nút "Tiếp theo", quý vị hiểu rằng các trang của trang web này sẽ được chuyển sang những ngôn ngữ khác ngoài tiếng Anh. Quận Cam đã cố gắng hết sức để bảo đảm tính chính xác của bản dịch. Tuy nhiên, không có vi tính hóa hay bản dịch tự động nào là hoàn hảo. Ví dụ, máy không hiểu được ngữ cảnh nên không thể diễn đạt trọn vẹn ý nghĩa của văn bản. Ngoài ra, có thể thấy sự khác biệt liên quan đến tiếng địa phương hay sở thích vùng miền. Bên cạnh đó, những hình ảnh có chữ, các tập tin PDF, và các ứng dụng đặc biệt trên trang web này cũng không thể được dịch. Quận Cam không chịu trách nhiệm về các bản dịch do Google cung cấp. Phiên bản gốc của trang web này là bằng tiếng Anh. Trong trường hợp có sự khác biệt giữa bản tiếng Anh của trang web và bản dịch, bản tiếng Anh sẽ được ưu tiên. Khi nhấp vào "Tiếp theo", quý vị hiểu rằng bất kỳ sự khác biệt hoặc bất đồng nào trong bản dịch đều không mang tính ràng buộc và không có hiệu lực pháp lý. Quận Cam không thể bảo đảm tính chính xác của văn bản đã chuyển đổi và không chịu bất kỳ trách nhiệm nào phát sinh từ việc quý vị sử dụng hoặc dựa vào bản dịch do Google cung cấp.

Descargo de responsabilidad

Para la comodidad de los usuarios, este sitio web del Condado de Orange utiliza el servicio gratuito de traducción de idiomas de Google. Al hacer clic en el botón "Siguiente", usted entiende que las páginas de este sitio web se convierten en un idioma distinto del inglés. El Condado de Orange ha hecho todo lo posible para garantizar la exactitud de la traducción. Sin embargo, no existe informatización ni traducción automática perfecta. Por ejemplo, la traducción no tiene en cuenta el contexto y el sistema no puede traducir el significado completo del texto. Además, puede encontrar diferencias relacionadas con los dialectos o preferencias regionales. Tampoco puede traducir gráficos con texto, archivos PDF y aplicaciones especiales en este sitio web. El Condado de Orange no es responsable de la traducción proporcionada por Google. La versión original de este sitio web está disponible en inglés. Si hay alguna discrepancia entre la versión en inglés de este sitio web y la versión traducida, prevalecerá la versión en inglés. Al hacer clic en "Siguiente", entiende que cualquier discrepancia o diferencia en la traducción no es vinculante y no tiene ningún efecto legal. El Condado de Orange no puede garantizar la exactitud del texto convertido y no asume ninguna responsabilidad que pueda derivarse de su uso o confianza en la traducción proporcionada por Google.

면책 조항

사용자의 편의를 위해, 본 오렌지 카운티 웹사이트는 무료 Google 언어 번역 서비스를 사용합니다. "Next"(다음) 버튼을 클릭하면, 본 웹사이트의 페이지가 영어 이외의 언어로 제공됨을 이해하는 것으로 간주됩니다. 오렌지 카운티는 번역의 정확성을 보장하기 위해 모든 노력을 기울였습니다. 그러나, 완벽한 전산화 또는 자동 번역은 없습니다. 예를 들어, 번역은 문맥을 고려하지 않기 때문에 텍스트의 의미를 온전히 번역할 수 없습니다. 또한, 지역 방언 또는 선호도와 관련된 차이점도 발견할 수 있습니다. 또한, 본 웹사이트에서는 텍스트가 포함된 그래픽, PDF 파일, 특수 애플리케이션은 번역할 수 없습니다. 오렌지 카운티는 Google에서 제공하는 번역에 대해 책임을 지지 않습니다. 본 웹사이트의 원래 버전은 영어로 제공됩니다. 본 웹사이트의 영어 버전과 번역 버전 사이에 불일치가 있는 경우 영어 버전이 우선합니다. "Next"(다음)를 클릭하면, 번역의 불일치 또는 불충분한 내용은 구속력이 없으며 법적 효력이 없음을 이해하는 것으로 간주됩니다. 오렌지 카운티는 변환된 텍스트의 정확성을 보장할 수 없으며, 사용자가 Google에서 제공하는 번역을 사용하거나 의존함으로써 발생할 수 있는 어떠한 책임도 지지 않습니다.

免責聲明

為方便使用者使用,本橙縣網站採用了 Google (谷歌) 免費語言翻譯服務。當您點擊「Next」(下一個)按鈕,即表示您了解本網站內容將自動翻譯為非英文語言。橙縣已盡力確保翻譯內容的準確性,但機器或自動翻譯服務無法達到完美。例如,翻譯無法完整呈現語境含義,亦可能無法精確反映原文內容。此外,您可能會發現因地區方言或用語偏好而有所差異。而且,本網站上的圖像文字、PDF 檔案以及特定應用程式內容亦無法透過此翻譯服務轉換。橙縣對 Google (谷歌) 翻譯所提供的翻譯內容不負任何責任。本網站的原始語言版本為英文。如英文版本與翻譯版本內容有任何不一致之處,應以英文版本為準。當您點擊「Next」(下一個)時,即表示您了解翻譯內容若有任何差異或不一致之處,均不具法律效力,且不具任何約束力。橙縣無法保證翻譯內容的準確性,亦不對因您使用或依賴 Google (谷歌) 翻譯結果而產生的任何後果承擔責任。

سلب مسئولیت

برای راحتی کاربران، وب‌ سایت اورنج کانتی از سرویس ترجمه رایگان گوگل استفاده می‌ کند. با کلیک روی دکمه "بعدی"، شما تأیید می‌کنید که محتوای این وب ‌سایت به زبان‌هایی غیر از انگلیسی ترجمه خواهد شد. اورنج کانتی تمام تلاش خود را برای دقت ترجمه‌ها انجام داده است، اما هیچ سامانه ترجمه ماشینی بدون خطا نیست. به عنوان مثال، این ترجمه‌ها معمولاً به زمینه‌ی متن حساس نیستند و ممکن است نتوانند معنا و مفهوم دقیق را به‌طور کامل منتقل کنند. همچنین ممکن است تفاوت‌هایی ناشی از لهجه‌ها یا ترجیحات منطقه‌ای مشاهده شود. علاوه بر این، امکان ترجمه گرافیک‌های حاوی متن، فایل‌های PDF و برخی برنامه‌های خاص در این وب‌سایت وجود ندارد. اورنج کانتی مسئول ترجمه‌ای که توسط گوگل ارائه می‌شود، نیست. نسخه اصلی این وب‌ سایت به زبان انگلیسی در دسترس است. در صورت وجود هرگونه اختلاف یا مغایرت بین نسخه انگلیسی و نسخه ترجمه‌ شده، نسخه انگلیسی معتبر و ملاک خواهد بود. با کلیک بر روی "بعدی" ، شما تأیید می‌کنید که هرگونه اختلاف یا مغایرت در ترجمه، الزام‌آور نبوده و هیچ‌گونه اثر قانونی ندارد. اورنج کانتی نمی‌ تواند دقت ترجمه ارائه ‌شده توسط گوگل را تضمین کند و هیچ‌ گونه مسئولیتی در قبال استفاده یا استناد شما به این ترجمه را بر عهده نمی‌ گیرد.

إخلاء المسؤولية

لراحة المستخدمين، يستخدم هذا الموقع الإلكتروني التابع لمقاطعة أورانج خدمة الترجمة المجانية من Google. من خلال النقر على زر "التالي"، فإنك تقر بأن صفحات هذا الموقع سيتم عرضها بلغات غير اللغة الإنجليزية. لقد بذلت مقاطعة أورانج أقصى جهد ممكن لضمان دقة الترجمة، إلا أن الترجمة الآلية لا يمكن أن تكون دقيقة بشكل كامل دائمًا. على سبيل المثال، لا تراعي الترجمة الآلية السياق، وقد لا تتمكن من نقل المعنى الكامل للنص الأصلي. بالإضافة إلى ذلك، قد تلاحظ وجود اختلافات تتعلق باللهجات أو التفضيلات الإقليمية. كما أن الترجمة لا تشمل الصور التي تحتوي على نصوص، أو ملفات PDF، أو التطبيقات الخاصة الموجودة على هذا الموقع. لا تتحمل مقاطعة أورانج أي مسؤولية عن الترجمة التي توفرها خدمة Google. النسخة الأصلية من هذا الموقع متاحة باللغة الإنجليزية. وفي حال وجود أي تعارض أو اختلاف بين النسخة الإنجليزية والنسخة المترجمة، تُعتَمد النسخة الإنجليزية. من خلال النقر على "التالي"، فإنك تقر بأن أي تعارض أو اختلاف في الترجمة غير مُلزِم ولا يترتب عليه أي أثر قانوني. ولا تضمن مقاطعة أورانج دقة النص المُترجَم، ولا تتحمل أي مسؤولية قد تنشأ عن استخدامك أو اعتمادك على الترجمة المقدمة من Google.